STIGhubSTIGhub
STIGsRMF ControlsCompare

STIGhub

A free tool to search and browse the entire DISA STIG library. Saves up to 75% in security compliance research time.

Navigation

  • Browse STIGs
  • Search
  • RMF Controls
  • Compare Versions

Resources

  • About
  • Release Notes
  • VPAT
  • DISA STIG Library
STIGs updated just now
Powered by Pylon
© 2026 Beacon Cloud Solutions, Inc. All rights reserved.
← Back to Storage Area Network Security Technical Implementation Guide

V-6619

CAT II (Medium)

Prior to installing SAN components (servers, switches, and management stations) onto the DOD network infrastructure, components are not configured to meet the applicable STIG requirements.

Rule ID

SV-6739r1_rule

STIG

Storage Area Network Security Technical Implementation Guide

Version

V2R5

CCIs

None

Discussion

Many SAN components (servers, switches, management stations) have security requirements from other STIGs. It will be verified that all requirement are complied with. The IAO/NSO will ensure that prior to installing SAN components (servers, switches, and management stations) onto the DOD network infrastructure, components are configured to meet the applicable STIG requirements.

Check Content

The reviewer will interview the IAO/NSO and view VMS to verify that prior to installing SAN components (servers, switches, and management stations) onto the DOD network infrastructure, components are configured to meet the applicable STIG requirements.

Fix Text

Perform a self assessment using the applicable checklists or scripts on any component device that has not been reviewed or request a formal review from FSO.