STIGhubSTIGhub
STIGsSearchCompare

STIGhub

A free tool to search and browse the entire DISA STIG library. Saves up to 75% in security compliance research time.

Navigation

  • Browse STIGs
  • Search
  • Compare Versions

Resources

  • About
  • Release Notes
  • VPAT
  • DISA STIG Library
STIGs updated 3 hours ago
Powered by Pylon
© 2026 Beacon Cloud Solutions, Inc. All rights reserved.
← Back to HP FlexFabric Switch NDM Security Technical Implementation Guide

V-217441

CAT III (Low)

The HP FlexFabric Switch must produce audit records containing information to establish when (date and time) the events occurred.

Rule ID

SV-217441r960894_rule

STIG

HP FlexFabric Switch NDM Security Technical Implementation Guide

Version

V1R4

CCIs

CCI-000131

Discussion

It is essential for security personnel to know what is being done, what was attempted, where it was done, when it was done, and by whom it was done in order to compile an accurate risk assessment. Logging the date and time of each detected event provides a means of investigating an attack; recognizing resource utilization or capacity thresholds; or identifying an improperly configured network device. In order to establish and correlate the series of events leading up to an outage or attack, it is imperative the date and time are recorded in all log records.

Check Content

Determine if the info-center feature is enabled on the HP FlexFabric Switch:

[HP] display info-center

Information Center: Enabled

If logging is not enabled, this is a finding.

Fix Text

Enable info-center feature on the HP FlexFabric Switch:

[HP] info-center enable

Note:  By default, the information center is enabled.